South African Class 9E, Series 2 | |
---|---|
E9030 at Saldanha, Western Cape, 26 July 2009 | |
Power type | Electric |
Designer | General Electric Company |
Builder | Union Carriage & Wagon |
Serial number | 5595-5600 |
Model | GEC 9E |
Build date | 1982-1983 |
Total produced | 6 |
UIC classification | Co-Co |
Gauge | 3 ft 6 in (1,067 mm) Cape gauge |
Bogies | 3.94 m (12 ft 11.1 in) wheelbase |
Wheel diameter | 1,220 mm (48.0 in) |
Wheelbase | 16.29 m (53 ft 5.3 in) |
Length | 21.132 m (69 ft 4.0 in) |
Width | 2.9 m (9 ft 6.2 in) |
Height | 3.9 m (12 ft 9.5 in) pantograph down |
Axle load | 28,000 kg (27.6 long tons) |
Locomotive weight | 166,300 kg (163.7 long tons) |
Current collection method |
Pantograph |
Traction motors | Six G415AZ |
Transmission | 18/83 Gear ratio |
Top speed | 90 km/h (56 mph) |
Power output | Per motor: 690 kW (930 hp) 1 hour 640 kW (860 hp) continuous Total: 4,140 kW (5,550 hp) 1 hour 3,840 kW (5,150 hp) continuous |
Tractive effort | 570 kN (130,000 lbf) starting 483 kN (109,000 lbf) 1 hour 388 kN (87,000 lbf) continuous |
Locomotive brakes | Rheostatic[1] |
Train brakes | Air & Vacuum |
Career | South African Railways Spoornet Transnet Freight Rail |
Class | Class 9E |
Power class | 50 kV AC |
Number in class | 6 |
Number | E9026-E9031[2] |
Delivered | 1982-1983 |
First run | 1982 |
In 1982 and 1983 the South African Railways expanded its existing Class 9E fleet by placing six new Class 9E, Series 2 electric locomotives with a Co-Co wheel arrangement in service on the Sishen-Saldanha iron ore line.[2]
Contents |
The Class 9E, Series 2 50 kV AC electric locomotive was designed for the South African Railways (SAR) by the General Electric Company (GEC) and was built by Union Carriage and Wagon (UCW) in Nigel, Transvaal. UCW delivered six locomotives in 1982 and 1983, numbered E9026 to E9031.[3]
In a break with prior practice, GEC works numbers were allocated to Class 9E locomotives. UCW usually did not allocate builder’s numbers to previous locomotives it built for the SAR. While the practice by most other locomotive builders was to allocate builder’s numbers or works numbers to record the locomotives built by them, UCW simply used the SAR running numbers for their record keeping.[2]
The locomotive has a single full width air conditioned cab. At the rear end the body work is lower to provide clearance for the 50 kV AC electrical equipment that is mounted on the roof. This consists of a single pantograph, a potential divider, a vacuum circuit breaker, a surge diverter and the main transformer’s high voltage terminal. The electrical control system is solid state, using thyristors.[1]
Since huge voltage drops are often encountered between electric sub-stations, the locomotive was designed to be able to operate on a supply varying between 55 and 25 kV AC. The battery boxes and the main air reservoirs are mounted between the bogies beneath the frame, where a compartment houses a small motor scooter for use by the crew for lineside inspections of the train that can be 4 kilometres (2.5 miles) long.[1]
Series 2 locomotives were delivered with five braking systems, air brakes for the locomotive, train air braking, train vacuum braking, a handbrake and dynamic rheostatic braking which can dissipate 4,200 kilowatts (5,600 horsepower). The Series 1 locomotives were delivered without a vacuum brake system.[1]
The Series 1 and Series 2 Class 9E’s can be visually distinguished from each other by their bogies, which were redesigned for the Series 2 locomotives.[2]
Class 9E locomotives are used on the 861 kilometres (535 miles) Sishen-Saldanha iron ore line to haul export ore from the open cast iron mines at Sishen in the Northern Cape to the harbour at Saldanha in the Western Cape. Most of the route is across the hot and dry Northern Cape, but the last 75 kilometres (47 miles) to Saldanha runs parallel to the Atlantic coastline and is subjected to the fog and salt sea air of the West Coast.[1][4]
In South Africa, the line is unusual for several reasons.
On the Sishen–Saldanha Orex line General Electric (GE) Class 34 series locomotives run consisted to Class 9E and Class 15E electric locomotives to haul the 342 wagon ore trains. Each wagon has a 100 ton capacity and the trains are at least 3.72 kilometres (2.3 miles) in length, powered by mixed consists of Class 9E and Class 15E electric and GE U26C Class 34-000, 34-400, 34-500 and 34-900 diesel-electric locomotives.[2][4][5][6]
A Class 9E or Class 15E electric locomotive serves as the master of each mixed electric and diesel-electric consist, with a total of between nine and twelve locomotives per train, twelve being the maximum allowed. Before the Class 15E was placed in service in 2010, motive power usually consisted of three sets, each made up of one or two Class 9E locomotives and one or two Class 34 diesels, with each set’s leading electric locomotive controlling its respective set of diesels by means of a slimkabel (smart cable). In effect each ore train was made up of three separate 114 wagon trains consisted together, with the locomotives of all three trains controlled through a Locotrol radio distributed power control system by one crew in the leading electric locomotive. A typical train would therefore be made up of locomotive set A, 114 wagons, locomotive set B, 114 wagons, locomotive set C and 114 wagons.[2][5][6][7]
Some problems were experienced using this configuration and after a couple of major derailments the locomotive configuration was changed to four sets, with locomotive set D initially consisting of two Class 34 diesel-electric locomotives at the rear end of the train pushing at between 40% and 50% of tractive power at all times, depending on the grades being traversed. The total number of locomotives were still between nine and twelve locomotives per train.[2][6]
As more Class 15Es arrived and were placed in service, the set D pair of Class 34 diesel-electrics were replaced with Class 9E or 15E electrics. The more powerful Class 15E also made it possible to use as few as seven locomotives per train, with locomotive sets A, B and C each consisting of one Class 15E and one Class 34, and set D of a single Class 15E.[2][6]
The main picture shows E9030 in Spoornet blue livery with outline numbers at the Salkor yard in Saldanha on 26 July 2009.
|